Town of Clifton Park
Please be advised that Permit Fees have increased for 2024
The Town Code is in the process of being updated with these new fees. Please see the link below for a complete list of all permit fees including 2023 and 2024 rates.
Documents:
pdf
2024 Permit Fees
(42 KB)
Building permit applications must be submitted through the Citizenserve Portal.
Please use this link for instructions on how to use the Citizenserve Portal:
- Citizenserve Instructions
- For Citizenserve technical issues or help navigating portal, please contact their Support Center at 1-800-325-9818; a member of their support team will be able to assist you. If you receive a voicemail, all staff are busy; please leave a message and your call will be returned promptly.
Building Permit & Application Information
FOR ALL PERMITS WHICH REQUIRE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
It is the responsibility of the applicant that the Building Department receive written approval from the following individuals, agencies, and/or departments prior to occupancy of structure.
- Final electrical inspection by an authorized inspection agency.
- Final inspection letter submitted to the Building Department prior to backfilling of "special" septic systems.
- Surveyed as-built plot plan submitted to the Building Department.
- Final inspection by the Fire Code Enforcement Officer of fireplaces, woodstoves, furnaces, water heaters, or other heat-producing equipment.
- Final inspection by the Building Department when building is completed.
The Building Department will issue a Certificate of Occupancy to an applicant when all the above items have been completed.
IT IS ILLEGAL TO OCCUPY ANY BUILDING WITHOUT A CERTIFICATE OF OCCUPANCY (IN VIOLATION OF THE CODE OF THE TOWN OF CLIFTON PARK ZONING REGULATIONS SECTION 208-108).
Under normal circumstances, your Certificate of Occupancy document will be prepared within forty-eight (48) hours after completion of all of the above.
Please be advised that inspections must also be called for at the following intervals:
- Footings before pour.
- Foundation after waterproofing, but before backfill.
- Sewer/septic and water installation (before backfill).
- Rough frame including plumbing, wiring, and heating, but without insulation.
- Insulation before sheetrock.
- Fireplace inspections as required by Fire Code Enforcement Officer.
- Furnace, water heater, or other heat-producing equipment.
- Final inspection.
A TWENTY-FOUR HOUR NOTICE IS REQUIRED TO SCHEDULE ALL INSPECTIONS.
Statewide Burn Ban
Created: November 13, 2024
PLEASE BE ADVISED:
There is a statewide Burn Ban in place for New York State. No Burn Permits will be issued until the ban has been lifted. The Burn Ban supersedes any Burn Permits that have been issued previously. While the statewide Burn Ban is...
A Message from the Building & Development Office
Created: October 25, 2024
We are entering cold weather season. For the safety of our Town residents, please be sure that your contractor is securing a building permit for the installation of wood and gas-fired heat appliances (fireplaces, wood stoves, water heaters, etc.)...
A Message from the Building and Development Department
Created: June 5, 2024
A building permit is required for swimming pools and hot tubs, and all required inspections (conducted by the Building Department) must be conducted and APPROVED prior to use per New York State Law.
The health and safety of our Town residents is ...
Saratoga County Hazard Mitigation Plan Update -- Public Meeting Dates
Created: March 20, 2024
In coordination with Saratoga County, the Cities of: Mechanicville, Saratoga Springs, Towns of: Ballston, Charlton, Clifton Park, Corinth, Day, Edinburg, Galway, Greenfield, Hadley, Halfmoon, Malta, Milton, Moreau, Northumberland, Providence, Sara...
Country Knolls Pool Liner Replacement Project
Created: July 1, 2023
Update 6/26/2023: The Country Knolls pool will open today at noon! Our team is completing the final opening details this morning. The last couple of weeks have been frustrating and another example of issues we have experienced with contractors thi...
Fire Code Appeals Board
Created: January 18, 2017
The Town of Clifton Park’s Fire Cope Appeals Board consists of six members and a chairman who are appointed by the Town Board for a three year term. The Fire Code Appeals Board reviews any appeals to the Code of The Town Of Clifton Park and has th...
Zoning Variances Information
Created: January 16, 2017
All variances for commercial property bordering residential property will require 500’ notifications and any use variance (commercial or residential) requires 500’ notification. Residential area variances only require notification of the abutting...
Fire Prevention
Created: January 16, 2017
Fire Prevention Bureau is Responsible For:
Enforcing the Building and Fire codes of New York State and the Code of the Town of Clifton Park as it pertains to the construction and inspection of industrial, residential and commercial sites, day c...
Building Permits
Created: January 5, 2017
FOR ALL PERMITS WHICH REQUIRE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
It is the responsibility of the applicant that the Building Department receive written approval from the following individuals, agencies, and/or departments prior to occupa...
Office Hours
Monday - Friday
8:00am - 5:00pm
Location
1 Town Hall Plaza
Clifton Park, NY 12065
Samuel C. Chase
Code Enforcement Officer
John DeSimone
Chief, Bureau of Fire Prevention
Ryan Boni
Building Inspector
James Coulombe
Building Inspector
Bruce Spiegel
Building Inspector
Tim Brousseau
Building Inspector
Cristi Shuhart
Principal Typist
Dolores Mabb
Principal Typist