Please ensure Javascript is enabled for purposes of website accessibility
Skip to main content

Town of Clifton Park

Building Permits

FOR ALL PERMITS WHICH REQUIRE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:

It is the responsibility of the applicant that the Building Department receive written approval from the following individuals, agencies, and/or departments prior to occupancy of structure.

  1. Final electrical inspection by an authorized inspection agency.
  2. Final inspection letter submitted to the Building Department prior to backfilling of "special" septic systems.
  3. Surveyed as-built plot plan submitted to the Building Department.
  4. Final inspection by the Fire Code Enforcement Officer of fireplaces, woodstoves, furnaces, water heaters, or other heat-producing equipment.
  5. Final inspection by the Building Department when building is completed. 

The Building Department will issue a Certificate of Occupancy to an applicant when all the above items have been completed.

IT IS ILLEGAL TO OCCUPY ANY BUILDING WITHOUT A CERTIFICATE OF OCCUPANCY (IN VIOLATION OF THE CODE OF THE TOWN OF CLIFTON PARK ZONING REGULATIONS SECTION 208-108).

Under normal circumstances, your Certificate of Occupancy document will be prepared within forty-eight (48) hours after completion of all of the above.

Please be advised that inspections must also be called for at the following intervals:

  1. Footings before pour.
  2. Foundation after waterproofing, but before backfill.
  3. Sewer/septic and water installation (before backfill).
  4. Rough frame including plumbing, wiring, and heating, but without insulation.
  5. Insulation before sheetrock.
  6. Fireplace inspections as required by Fire Code Enforcement Officer.
  7. Furnace, water heater, or other heat-producing equipment.
  8. Final inspection.

A TWENTY-FOUR HOUR NOTICE IS REQUIRED TO SCHEDULE ALL INSPECTIONS.

For Permit Fees, click here, or call Building & Development at: (518) 371-6702

Please click on the link below to access downloadable, documents, forms and applications. 

folder 01 Building Permits
folder 02 Generator Information
03 Sewer and Septic Permit Information
folder 04 Heat Producing Equipment
folder 05 Signage Permit
folder 06 Swimming Pools
folder 07 Zoning Variances
folder 08 Solar/Photovoltaic Installations
09 Other Permits
folder 10 Commercial
folder 11 Change of Tenant
 

 


Created: October 25, 2024
We are entering cold weather season.  For the safety of our Town residents, please be sure that your contractor is securing a building permit for the installation of wood and gas-fired heat appliances (fireplaces, wood stoves, water heaters, etc.)...
Created: June 5, 2024
A building permit is required for swimming pools and hot tubs, and all required inspections (conducted by the Building Department) must be conducted and APPROVED prior to use per New York State Law. The health and safety of our Town residents is ...
Created: March 20, 2024
In coordination with Saratoga County, the Cities of: Mechanicville, Saratoga Springs, Towns of: Ballston, Charlton, Clifton Park, Corinth, Day, Edinburg, Galway, Greenfield, Hadley, Halfmoon, Malta, Milton, Moreau, Northumberland, Providence, Sara...
Created: July 1, 2023
Update 6/26/2023: The Country Knolls pool will open today at noon! Our team is completing the final opening details this morning. The last couple of weeks have been frustrating and another example of issues we have experienced with contractors thi...
Created: January 18, 2017
The Town of Clifton Park’s Fire Cope Appeals Board consists of six members and a chairman who are appointed by the Town Board for a three year term. The Fire Code Appeals Board reviews any appeals to the Code of The Town Of Clifton Park and has th...
Created: January 16, 2017
Please be advised that Permit Fees have increased for 2024  The Town Code is in the process of being updated with these new fees.  Please see the link below for a complete list of all permit fees including 2023 and 2024 rates.  Documents: 2024 Per...
Created: January 16, 2017
All variances for commercial property bordering residential property will require 500’ notifications and any use variance (commercial or residential) requires 500’ notification.  Residential area variances only require notification of the abutting...
Created: January 16, 2017
Fire Prevention Bureau is Responsible For: Enforcing the Building and Fire codes of New York State and the Code of the Town of Clifton Park as it pertains to the construction and inspection of industrial, residential and commercial sites, day c...
Wade Schoenborn
Director of Building & Development
(518) 371-6702
(518) 383-2668
This email address is being protected from spambots. You need JavaScript enabled to view it.

Office Hours

Monday - Friday
8:00am - 4:00pm

Location

1 Town Hall Plaza
Clifton Park, NY 12065


Robert Adams
Code Enforcement Officer

Samuel C. Chase
Code Enforcement Officer

John DeSimone
Chief, Bureau of Fire Prevention

Ryan Boni
Building Inspector

James Coulombe
Building Inspector

Max Luetters
Building Inspector

Bruce Spiegel
Building Inspector

Cristi Shuhart
Principal Typist

Dolores Mabb
Principal Typist